Magnetisch

EMC study and stakeholder analysis forthe Doetinchem – Wesel line

EMC study and stakeholder analysis forthe Doetinchem – Wesel line

TenneTand its partner Amprionare constructing a new 380kV high-voltage line from Doetinchem in the Netherlandsto Wesel in Germany. TenneT is handling the Dutch section, and will combine it with an existing 150kV line from Doetinchemto Winterswijk.

TenneT hired us for electromagnetic compatibility (EMC) studies, which involvedidentifying and analysing stakeholders. We calculatedthe interference that will occur on62 private properties and at 18 companies situated along the path of the power line: from the most basic coffee machine to complex operating equipment, electric fencesand a pipeline system. Where necessary, we advised on mitigation measures to limit the interference. The project also included magnetic field calculations and measurements for TenneT.

Location

Doetinchem – Wesel

Period

2013-2017

Customer

TenneT